Skip to main content
NV Energy
Reid Gardner Generating Station
Mesa Landfill
Location restrictions
Unstable areas
Ground Stability Location Restriction Demonstration
Operating criteria
CCR fugitive dust control plan
CCR fugitive dust control plan
CCR fugitive dust control plan Revision 01
CCR fugitive dust control plan Revision 02
CCR fugitive dust control plan Revision 03
Annual fugitive dust control report
2016 - Annual fugitive dust control report
2017 - Annual fugitive dust control report
2018 - Annual fugitive dust control report
2019 - Annual fugitive dust control report
2020 - Annual fugitive dust control report
2021 - Annual fugitive dust control report
2022 - Annual fugitive dust control report
2023 - Annual fugitive dust control report
Run-on and run-off control plan
2016 Run-on and run-off control system drawing
2016 Run-on and run-off control system plan
Run-on and run-off control system plan - Updated October 2021
Annual Engineering Inspection Reports
2015 Annual Report
2016 Annual Report
2017 Annual Report
2018 Annual Report
2019 Annual Report
2020 Annual Report
2021 Annual Report
2022 Annual Report
2023 Annual Report
Groundwater monitoring and corrective action
Annual groundwater monitoring and corrective action report
2017 Annual groundwater monitoring and corrective action report
Alternate Source Demonstration and Addendum to the CCR 2017 Annual Groundwater Monitoring and Corrective Action Report
2018 Annual groundwater monitoring and corrective action report
2019 Annual groundwater monitoring and corrective action report
2020 Annual groundwater monitoring and corrective action report
2021 Annual groundwater monitoring and corrective action report
2022 Annual groundwater monitoring and corrective action report
2023 Annual groundwater monitoring and corrective action report
Groundwater monitoring system certification
Groundwater monitoring system certification
Statistical method certification
Statistical method certification
Statistical method certification Revision 01
Closure and post-closure care
Closure plans
Closure plan
Closure plan Revision 01
Post-closure care plan
Post-closure care plan
Post-closure care plan Revision 01
Surface Impoundment M-7
Location restrictions
Placement above the uppermost aquifer
Placement above the uppermost aquifer
Wetlands
Wetlands
Fault areas
Fault areas
Seismic impact zones
Seismic impact zones
Unstable areas
Unstable areas
Design criteria
Documentation of liner type
Documentation of liner type
Hazard potential classification assessment
2016 Hazard potential classification assessment
2021 Hazard potential classification assessment
History of Construction
Construction history
Structural stability assessment
Structural stability assessment - 2021
Structural stability assessment - 2016
Safety factor assessment
Safety factor assessment - August 2021
Safety factor assessment - August 2016
Emergency Action Plan (EAP)
Documentation of Annual EAP Meeting
2018 Documentation of Annual EAP Meeting
2019 Documentation of Annual EAP Meeting
2020 Documentation of Annual EAP Meeting
2021 Documentation of Annual EAP Meeting
2022 Documentation of Annual EAP Meeting
2023 Documentation of Annual EAP Meeting
Emergency Action Plan
Emergency Action Plan
Emergency Action Plan
Emergency Action Plan
Emergency Action Plan
Operating criteria
CCR fugitive dust control plan
CCR fugitive dust control plan
CCR fugitive dust control plan Revision 01
CCR fugitive dust control plan Revision 02
CCR fugitive dust control plan Revision 03
Annual fugitive dust control report
2016 Annual fugitive dust control report
2017 Annual fugitive dust control report
2018 Annual fugitive dust control report
2019 Annual fugitive dust control report
2020 Annual fugitive dust control report
2021 Annual fugitive dust control report
2022 Annual fugitive dust control report
2023 Annual fugitive dust control report
Inflow design flood control system plan
2016 Inflow design flood control system plan
2021 Inflow design flood control system plan
Annual engineering inspection reports
2015 Annual Inspection
2016 Annual Inspection
2017 Annual Inspection
2018 Annual Inspection
2019 Annual Inspection
2020 Annual Inspection
2021 Annual Inspection
2022 Annual Inspection
2023 Annual Inspection
Groundwater monitoring and corrective action
Annual groundwater monitoring and corrective action report
2017 Annual groundwater monitoring and corrective action report
Alternate Source Demonstration and Addendum to the CCR 2017 Annual Groundwater Monitoring and Corrective Action Report
2018 Annual groundwater monitoring and corrective action report
2019 Annual groundwater monitoring and corrective action report
2020 Annual groundwater monitoring and corrective action report
2021 Annual groundwater monitoring and corrective action report
2022 Annual groundwater monitoring and corrective action report
2022 Annual groundwater monitoring and corrective action report
2023 Annual groundwater monitoring and corrective action report
Groundwater monitoring system certification
Groundwater monitoring system certification
Statistical method certification
Statistical method certification
Closure and post-closure care
Closure plans
Closure Plan Revision 1
Closure Plan Revision 2
Notification of intent to close
Notification of intent to close
Post-closure care plan
Post-closure care plan
Surface Impoundment B-1
Location restrictions
Design criteria
Documentation of liner type
Documentation of liner type
Hazard potential classification assessment
Hazard potential classification assessment
History of Construction
History of Construction
Structural stability assessment
Structural stability assessment
Safety factor assessment
Safety factor assessment
Operating criteria
CCR fugitive dust control plan
CCR fugitive dust control plan Revision 2
Annual Fugitive Dust Control Report
2017 Annual fugitive Dust Control Report
2018 Annual fugitive Dust Control Report
2019 Annual fugitive Dust Control Report
2020 Annual fugitive Dust Control Report
Inflow design flood control system plan
Inflow design flood control system plan
Annual engineering inspections reports
2017 Annual engineering inspections reports
2018 Annual engineering inspections reports
2019 Annual engineering inspections reports
Groundwater monitoring and corrective action
Annual groundwater monitoring and corrective action report
Annual groundwater monitoring and corrective action report
Groundwater monitoring system certification
Groundwater monitoring system certification
Statistical method certification
Statistical method certification
Closure and post-closure care
Closure plans
Notification of intent to initiate closure
Closure plan
Notification of completion of closure
Closure certificate
Closure certificate addendum
Post-closure care plan
Post-closure care plan
Surface Impoundment B-2
Location restrictions
Design criteria
Documentation of liner type
Documentation of liner type
Hazard potential classification assessment
Hazard potential classification assessment
History of Construction
History of Construction
Structural stability assessment
Structural stability assessment
Safety factor assessment
Safety factor assessment
Operating criteria
CCR fugitive dust control plan
CCR fugitive dust control plan Revision 2
Annual Fugitive Dust Control Report
2017 Annual fugitive Dust Control Report
2018 Annual fugitive Dust Control Report
2019 Annual fugitive Dust Control Report
2020 Annual fugitive Dust Control Report
Inflow design flood control system plan
Inflow design flood control system plan
Annual engineering inspections reports
2017 Annual engineering inspections reports
2018 Annual engineering inspections reports
2019 Annual engineering inspections reports
Groundwater monitoring and corrective action
Annual groundwater monitoring and corrective action report
Annual groundwater monitoring and corrective action report
Groundwater monitoring system certification
Groundwater monitoring system certification
Statistical method certification
Statistical method certification
Closure and post-closure care
Notification of intent to close
Notification of intent to initiate closure
Closure plans
Closure plan
Notification of completion of closure
Closure certificate
Closure certificate addendum
Notification of completion of post-closure care
Post-closure care plan
Surface Impoundment B-3
Location restrictions
Design criteria
Documentation of liner type
Documentation of liner type
Hazard potential classification assessment
Hazard potential classification assessment
History of Construction
History of Construction
Structural stability assessment
Structural stability assessment
Safety factor assessment
Safety factor assessment
Operating criteria
CCR fugitive dust control plan
CCR fugitive dust control plan Revision 2
Annual Fugitive Dust Control Report
2017 Annual fugitive Dust Control Report
2018 Annual fugitive Dust Control Report
2019 Annual fugitive Dust Control Report
2020 Annual fugitive Dust Control Report
Inflow design flood control system plan
Inflow design flood control system plan
Annual engineering inspections reports
2017 Annual engineering inspections reports
2018 Annual engineering inspections reports
2019 Annual engineering inspections reports
Groundwater monitoring and corrective action
Annual groundwater monitoring and corrective action report
Annual groundwater monitoring and corrective action report
Groundwater monitoring system certification
Statistical method certification
Closure and post-closure care
Notification of intent to close
Closure plans
Closure plan
Notification of completion of closure
Closure certificate
Closure certificate addendum
Notification of completion of post-closure care
Post-closure care plan
Notification of intent to initiate closure
Notification of intent to initiate closure
Surface Impoundment E-1
Location restrictions
Design criteria
Documentation of liner type
Documentation of liner type
Hazard potential classification assessment
Hazard potential classification assessment
History of Construction
History of construction
Structural stability assessment
Structural stability assessment
Safety factor assessment
Safety factor assessment
Operating criteria
CCR fugitive dust control plan
CCR fugitive dust control plan Revision 2
Annual Fugitive Dust Control Report
2017 - Annual fugitive Dust Control Report
2018 - Annual fugitive Dust Control Report
2019 - Annual fugitive Dust Control Report
2020 - Annual fugitive Dust Control Report
Inflow design flood control system plan
Inflow design flood control system plan
Annual engineering inspections reports
2017 Annual engineering inspections reports
2018 Annual engineering inspections reports
2019 Annual engineering inspections reports
Groundwater monitoring and corrective action
Annual groundwater monitoring and corrective action report
Annual groundwater monitoring and corrective action report
Groundwater monitoring system certification
Groundwater monitoring system certification
Statistical method certification
Statistical method certification
Closure and post-closure care
Notification of intent to close
Closure plans
Closure plan
Notification of completion of closure
Closure certificate
Closure certificate addendum
Notification of completion of post-closure care
Notification of intent to initiate closure
Notification of intent to initiate closure
Post-closure care plan
Post-closure care plan
Surface Impoundment M-5
Location restrictions
Placement above the uppermost aquifer
Placement above the uppermost aquifer restriction demonstration
Wetlands
Wetlands location restriction demonstration
Fault areas
Fault areas location restriction demonstration
Seismic impact zones
Seismic impact zone demonstration
Unstable areas
Ground stability location restriction demonstration
Design criteria
Documentation of liner type
Documentation of liner type
Hazard potential classification assessment
2016 Hazard potential classification assessment
2021 Hazard potential classification assessment
History of Construction
History of Construction
Structural stability assessment
Structural stability assessment - 2021
Structural stability assessment - 2016
Safety factor assessment
Safety factor assessment - August 2021
Safety factor assessment - August 2016
Emergency Action Plan
Emergency Action Plan
Emergency Action Plan
Emergency Action Plan
Emergency Action Plan
Documentation of Annual EAP Meeting
2018 Documentation of Annual EAP Meeting
2019 Documentation of Annual EAP Meeting
2020 Documentation of Annual EAP Meeting
2021 Documentation of Annual EAP Meeting
2022 Documentation of Annual EAP Meeting
2023 Documentation of Annual EAP Meeting
Operating criteria
CCR fugitive dust control plan
CCR fugitive dust control plan
CCR fugitive dust control plan Revision 01
CCR fugitive dust control plan Revision 02
CCR fugitive dust control plan Revision 03
Annual fugitive dust control report
2016 Annual fugitive dust control report
2017 Annual fugitive dust control report
2018 Annual fugitive dust control report
2019 Annual fugitive dust control report
2020 Annual fugitive dust control report
2021 Annual fugitive dust control report
2022 Annual fugitive dust control report
2023 Annual fugitive dust control report
Inflow design flood control system plan
2016 Inflow design flood control system plan
2021 Inflow design flood control system plan
Annual engineering inspection reports
2015 Annual Inspection
2016 Annual Inspection
2017 Annual Inspection
2018 Annual Inspection
2019 Annual Inspection
2020 Annual Inspection
2021 Annual Inspection
2022 Annual Inspection
2023 Annual Inspection
Groundwater monitoring and corrective action
Annual groundwater monitoring and corrective action report
2017 Annual groundwater monitoring and corrective action report
Alternate Source Demonstration and Addendum to the CCR 2017 Annual Groundwater Monitoring and Corrective Action Report
2018 Annual groundwater monitoring and corrective action report
2019 Annual groundwater monitoring and corrective action report
2020 Annual groundwater monitoring and corrective action report
2021 Annual groundwater monitoring and corrective action report
2022 Annual groundwater monitoring and corrective action report
2023 Annual groundwater monitoring and corrective action report
Groundwater monitoring system certification
Groundwater monitoring system certification
Statistical method certification
Statistical method certification
Closure and post-closure care
Closure plans
Closure Plan
Closure Plan Revision 01
Closure Plan Revision 02
Notification of intent to close
Notification of intent to close
Post-closure care plan
Post-closure care plan
North Valmy Generating Station
Landfill
Location restrictions
Unstable areas
Ground Stability Demonstration
Operating criteria
CCR fugitive dust control plan
CCR fugitive dust control plan Revision 02
Annual fugitive dust control report
2016 - Annual fugitive dust control report
2017 - Annual fugitive dust control report
2018 - Annual fugitive dust control report
2019 - Annual fugitive dust control report
2020 - Annual fugitive dust control report
2021 - Annual fugitive dust control report
2022 - Annual fugitive dust control report
2023 - Annual fugitive dust control report
Run-on and run-off control plan
Run-on and run-off control plan
Run-on and run-off control plan
Annual engineering inspection reports
2016 - Annual engineering inspection report
2017 - Annual engineering inspection report
2018 - Annual engineering inspection report
2019 - Annual engineering inspection report
2020 - Annual engineering inspection report
2021 - Annual engineering inspection report
2022 - Annual engineering inspection report
2023 - Annual engineering inspection report
Groundwater monitoring and corrective action
Annual groundwater monitoring and corrective action report
2017 Annual groundwater monitoring and corrective action report
Alternate Source Demonstration and Addendum to the 2017 Annual Groundwater Monitoring and Corrective Action Report
2018 Annual groundwater monitoring and corrective action report
2019 Annual groundwater monitoring and corrective action report
Alternate Source Demonstration and Addendum to the 2019 Annual Groundwater Monitoring and Corrective Action Report
2020 Annual groundwater monitoring and corrective action report
2021 Annual groundwater monitoring and corrective action report
Alternate Source Demonstration and Addendum to the 2021 Annual Groundwater Monitoring and Corrective Action Report
2022 Annual groundwater monitoring and corrective action report
2023 Annual groundwater monitoring and corrective action report
Groundwater monitoring system certification
Groundwater monitoring system certification
Groundwater Monitoring System Certification Rev
Statistical method certification
Statistical method certification
Statistical Method Certification Rev
Closure and post-closure care
Closure plans
Closure plan
Post-closure care plan
Post-closure care plan
If you have questions related to the CCR rule compliance data and information on this site, email
info@brkenergy.com
.